Flooring Installation Timeline: What to Expect From Start to Finish

New floors change the whole feel of a home, but one of the first questions people ask is how long the project will take. The honest answer is that it depends on the product, the size of the space, and a few steps that happen before installation day. So how long does it take to install flooring from the moment you start shopping to the moment you walk on your new floors? Here is the full process, step by step, so you know exactly what to expect.

Key Takeaways

  • The full journey runs from showroom visit to final cleanup, not just install day
  • Most installations take one to three days once materials arrive
  • Room size, product type, and prep work all affect installation timelines
  • Hardwood flooring installation often needs extra time to acclimate
  • Ordering and delivery can add one to several weeks before work begins
  • A good flooring team handles measuring, moving furniture, and cleanup for you

Step 1: The Showroom Visit

Everything starts with choosing your floor. During a showroom visit, you can see and feel your options, compare colors in different lighting, and talk through what suits your lifestyle and budget. This step takes as little as an hour, though many homeowners visit more than once before deciding. Bringing photos and rough measurements of your rooms helps your design consultant guide you faster.

Step 2: In-Home Measurement

Once you have narrowed your choices, a professional measures your space. Accurate measurements make sure you order the right amount of material, account for waste, and avoid delays later.

Step 3: Ordering and Delivery

After measuring, your flooring is ordered. This is often the longest part of the timeline, and it has nothing to do with the installers. In-stock products may arrive within a few days, while special orders can take one to several weeks. Your consultant can give you a delivery window so you can plan around it.

Step 4: Preparing the Room

On installation day, the crew starts by preparing the space. This includes moving furniture, removing old flooring, and inspecting the subfloor. A clean, level, dry subfloor is essential for a lasting result, so any needed repairs happen here. Prep can take anywhere from a couple of hours to a full day, depending on the condition of the existing floor.

Step 5: Installation

Now the new floor goes down. Installation timelines vary most by product and by the size of the room you are covering. As a general guide for an average room, luxury vinyl and laminate often install in one day, carpet usually takes a day, tile can take two to three days because of layout and curing, and hardwood can take several days. A whole-home project naturally runs longer than a single room.

A Note on Hardwood Flooring Installation

Hardwood deserves special mention. Solid wood needs time to acclimate to the humidity and temperature of your home before it is installed, and this step can add several days to the schedule. Skipping it can cause the planks to warp or gap later. If you choose site-finished hardwood, you also need to allow drying time between sanding and staining. Your installer will build these steps into the plan, so hardwood flooring installation simply requires a little more patience for a beautiful, long-lasting result.

Step 6: Cleanup and Final Walkthrough

When the floor is in, a good crew cleans up thoroughly, removes debris, and moves your furniture back into place. Then you and the installer do a final walkthrough to make sure everything meets your expectations. This last step usually takes under an hour, and it is your chance to ask any questions before the job is complete.

Frequently Asked Questions

How long does it take to install flooring in one room?

For an average-sized room, most floors go in within a single day once materials are on hand. Luxury vinyl, laminate, and carpet are the quickest, while tile and hardwood take longer. Prep work and subfloor repairs can add time, so ask your installer for a room-specific estimate.

Why does ordering take longer than installation?

Installation is fast, but getting the product can take time. In-stock items may arrive in days, while special orders and custom colors can take one to several weeks to be manufactured and delivered. Once everything arrives, the actual installation is usually the shortest part of the project.

Does hardwood take longer to install than other floors?

Often, yes. Hardwood flooring installation usually includes an acclimation period so the wood adjusts to your home before it is laid, and site-finished floors need drying time between coats. These steps protect your investment, so they are worth the extra days in the schedule.

Do installers move furniture and clean up afterward?

With most professional installations, yes. The crew typically moves furniture, removes your old flooring, and cleans up when they finish. It is always smart to confirm what is included when you book, so there are no surprises on installation day.

Ready to Get Started?

Now that you know what to expect, the next step is choosing the right flooring for your home. At Baker Bros, you can explore a wide range of flooring materials, get free design guidance, and have your new floors professionally installed by their experienced team. Visit a showroom to explore your options, discuss your project, and get started with confidence.

Reviewed By: Phil Koufidakis, President at Baker Bros Area Rugs and Flooring

Phil Koufidakis has spent more than 25 years helping Arizona homeowners find the right flooring for their homes. As President of Baker Bros Area Rugs and Flooring, he brings decades of hands-on experience and industry knowledge.

Soundproof Flooring: The Best Floors for a Quieter, More Comfortable Home

Read More

12 Questions to Ask Before Buying New Flooring

Read More

Subscribe to newsletter

By subscribing you agree to with our Privacy Policy.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Soundproof Flooring: The Best Floors for a Quieter, More Comfortable Home

Read More

12 Questions to Ask Before Buying New Flooring

Read More

Subscribe to newsletter

By subscribing you agree to with our Privacy Policy.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

Join our newsletter

Stay informed, get inspired, and be the first to know about promotions – subscribe now!

* indicates required
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

By subscribing, you agree to our Privacy Policy.

© 2024 BakerBros. All rights reserved.